On the website for this route (the new Castleford Greenway) is news that a planning application has been made to connect this trail to the existing Methley-Stanley trail, which forms part of NCN67. The intention is to use as much as possible of the trackbed which currently separates the two sections, and install a metalled surface in order to make the whole thing an all-weather route. The completed trail from Cutsyke to Stanley will be about 5 miles long. (Keith Holliday)